Heating and ventilation project for a repair block

Price in currencies:
0.7 $ · 60 RUB · 0.61 €
Category:
Price:
0.7 $
Item:
00090_Проект отопления и вентиляции ремонтного блока.rar (2074.23 KB)
Uploaded:
13.11.2024 12:32:51
Sales:
4
Refunds:
0
0.7 $

You will choose the payment method — bank card, cryptocurrency, WebMoney, Alipay, PIX, UPI and others — on the next step. See «Payment methods» for details.

Heating and ventilation project for a repair block

Project of heating and ventilation of the building of the repair and maintenance unit (REB) and the built-in boiler room:
- General data.
- Heating. Plan at elevation 0.000, 3.300.
- Heating. Heating system diagram. Unit 1 2, 3.
- Heating. Control unit.
- Ventilation. Plan at elevation 0.000, 3.300.
- Ventilation. Roof plan at elevation 6.600. Diagrams of systems BE7-BE40.
- Ventilation. Diagrams of systems P1-P4-, B1-B7, BE1-BE6, BE41.
- Ventilation. Fragment of plan at elevation 0.000, 3.300. Section 1-1, 2-2, 3-3, 4-4.
- Ventilation. Fragment of plan at elevation 0.000, 3.300. Heat supply scheme of heaters.
- Input of heat network. Fragment of plan at mark. 0.000. Section 1-1.

File format: dwg, tif (AutoCAD 2010 not editable)
Note: source files of format *.tif must be in the same folder with the project file *.dwg

Download file «Project of heating and ventilation of repair block» >>>

Tags: gas compressor station, REB

Reviews: (0)

No customer reviews yet.

More in «Drawings»

All items in «Drawings» →